I am now ready to finish the front MR2 steering knuckle modifications. I know I say I am adding a 1/8" piece of steel tubing but it is actually 1/4" thick. These half pieces of tubing will be used to prevent the reworked mounts from crushing due to the strut bolt. After everything is welded together I smoothed it off with some bondo and paint. They are now ready to be refit.
Showing posts with label modifications. Show all posts
Showing posts with label modifications. Show all posts
Wednesday, April 14, 2010
Finish the MR2's front steering knuckle modifications #192
Posted by
Cythia
at
7:25 AM
0
comments
Labels: Finish, knuckle, modifications, steering
Subscribe to:
Posts (Atom)